Honeywell nätverkskort HC900 Manual

PDF-manualer
228 Sidor Engelska

Honeywell nätverkskort HC900
Installation Guide - Overview
Revision 5 HC900 Hybrid Controller Installation and User Guide 49
9/03
Installation Guide
Overview
This section contains procedures for installing one or more HC900 Controllers. It is recommended that the
Site Plan Documentation, completed as a part of Pre-Installation Planning, is used as a primary data source
and checklist while performing these procedures.
It is also recommended that the Site Plan Documentation and the information in this section be reviewed
together before beginning the installation. Familiarity with the overall procedure will help to prevent errors
and will promote efficiency in general.
Tools Required
The primary tools required during installation are listed in Table 9.
Equipment Preparation
A checklist for site preparation is given in Table 10.
Table 9 - Installation Tools
Item Description Comments
1
2
3
4
5
6
7
8
9
10
11
Common tools
Wire strippers
Crimper
Screwdrivers
Small flat-tip
Small/medium flat-tip or Phillips
Large (long blade)
Electric drill, with drill bits for #10 or M4
screws, and with drill-bit extender
Vacuum cleaner, brush
Pen, ball-point or felt-tip, for entering data on
labels for I/O modules)
Multi-Meter (Volt/Ohms/Amps)
Soldering pencil or gun (for attaching filter
capacitors to I/O wiring shields)
Special tools
Precision meters
For Power Supply and for I/O Wiring
For Terminal Lugs on Power Supply wiring
and on I/O wiring shields
For Euro-style Terminal Blocks
For Barrier style Terminal blocks); also for
captured screws in Terminal Blocks
For use as I/O Module extractor
For rack mounting
For use during and after drilling operations
For entering data on labels for I/O modules
For safety checks and for equipment test
For attaching filter capacitors on I/O wiring
shields
(If required) for testing Analog calibration;
refer to Analog Calibration in this manual.
Relaterade manualer för Honeywell nätverkskort HC900